top of page
QUICK LINKS
Tunnel near Houtkade,The Netherlands
FDN performed the complete engineering of a bike- and pedestrian tunnel underneath the railway of Randstadrail. FDN was responsible for the entire design of the tunnel. The tunnel deck was build next to the railway and afterwards moved to its definite position in one day. This project provided FDN Engineering with a lot of knowledge about moving and/or sliding possibilities of the deck.
bottom of page